Forum Discussion

Foonus's avatar
Foonus
Ambassador
1 month ago

In-building work completed 2.5 years ago, entrance cable STILL not placed.

Commercial site in Edmonton (156 St, 116 Ave). TELUS installed the in-building fibre here roughly two years ago. Riser is in, terminated to the SFP in our equipment room. The building is physically r...