Dannyboy's profile

Just Moved In

 • 

1 Message

Fiber Drop

My street in Kitchener is getting fiber. Great, but the workers hired to drop the line on my property dont seem to be able to (a) read a drawing, (b) read associated instruction notes and (c) cant come when they are schedule to come. So far, 2 different person came to ask permission to do the work, ie: 2 drawings were made, 2 sets of notes were made, 2 signatures. The work is schedule - they dont show up. The work is reschedule,  they come the day before it was schedule. The install the line, they dont follow instructions. I think I may cancel this fiber internet thing before i even get it. 

No Responses!

Top Contributors

View More

Community Stats

Loading...

Total Posts

Loading...

Total Members

Loading...

Total Posts with Accepted Solutions

Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...